WHAT SURFACES CAN A STRUCTURE BE INSTALLED ON?

A: We can install on any level surface, such as concrete, asphalt, dirt/ground, and gravel. Reach out to an authorized dealer about what is possible when you choose Custom Built Structures to build for you.

HOW LEVEL DOES MY LAND NEED TO BE FOR INSTALLATION?

Your installation site should be level with a 1-3” tolerance. If your site is out of level greater than 3” then you should prepare your site before installation so that it’s level. We highly recommend you speak with a local gravel or concrete contractor so that you can decide the best foundation for your structure based on your budget and use.

 
WHAT TYPES OF ANCHORING COMES WITH MY STRUCTURE?

All of our structures come with the anchoring that matches the surface type. Installation on ground comes with rebar and 3-ft mobile home anchors, while concrete surfaces come with concrete anchors. Asphalt comes with asphalt anchors. Custom anchoring requirements beyond ground/gravel, concrete, or asphalt may be subject to an additional installation fee for labor and material.

HOW LONG DOES IT TAKE TO GET MY STRUCTURE INSTALLED?

A: Once your order has been placed it will be reviewed for pricing accuracy and sent to the scheduling department. You will be assigned a scheduling contact person. You will receive a phone call (and/or email/text) to see if are ready for installation. Typically this will be 2-4 days prior to one of our installation crews being in your area. Due to the volume of customers inquiries you will not receive contact until our crews will be coming through your area. It is important to accept calls from our office when we call so that way we know you are available. Missed scheduling calls could result in rescheduling delays and potential reschedule or return-trip fees.

 

ARE STEEL BUILDINGS BUILT AIRTIGHT, LIKE WOOD STRUCTURES?

A: We highly recommend customers that who require an airtight building against the outdoor elements consider talking to their local building contractor or handyman to add foam-closure strips, caulking, or additional measures as needed depending on the custom built structure. Installed flashing and materials may not provide “airtight” protection against all outdoor elements as we do not provide a finished interior or recommend the intended use to be for dry storage unless additional measures are taken to make the steel structure airtight. This is the same guidance for all steel tubular built structures, one big difference between stick-built (wood) vs. steel tubing built structures. Please ask your sales associate if you have additional questions or call us 877-552-7020.

 

WHAT IS THE DIFFERENCE BETWEEN VERTICAL & HORIZONTAL SIDES/ENDS ?

When discussing the closed sides or ends of a metal building, the terms ‘horizontal’ and ‘vertical’ refer to the direction of the sheet metal ridges on the exterior surface of the structure. The orientation of these metal ridges can have a significant impact on the visual appeal of the building. Opting for horizontal sides or ends is often the more affordable choice. On the other hand, upgrading to vertical sides and/or ends necessitates additional tubing to properly install the sheet metal panels. This increased complexity requires more labor and materials when compared to the horizontal option. In certain cases, homeowner’s associations mandate the use of vertical sides/ends, while some customers choose the vertical orientation due to personal style preferences.

 

WHAT SIZE CONCRETE SHOULD I POUR FOR MY STRUCTURE?

All Concrete Pads are Recommended to pour 2” wider on all sides. Units 18×20 need to have 18’4”x20’4” Concrete Pad. We recommend that you work with an experienced concrete professional to guide you on how to pour a concrete pad based on your setup and needs. The recommended depth of your concrete pad and other general ideal concrete guidance will vary depending on your area. Be sure to check with your local permitting office to ensure you are within their guidelines for your concrete pad and structure.

 

WILL BASERAIL CAULK PREVENT WATER FROM SEEPING IN?

Caulking can help prevent water from seeping under a BaseRail or other structures. It creates a seal that can deter water infiltration. However, as you mentioned, there’s no 100% guarantee because surfaces can be porous or may have minor imperfections where water could still find a way in.

It’s accurate to point out that even surfaces like concrete slabs can have minor variations that might allow water underneath. This is why proper construction techniques are important.

The recommended approach of pouring a concrete pad to match engineered drawings and ensuring that sheet metal overlaps the pad’s edge is a good water management strategy. This creates a barrier to direct water away from the structure and can be more effective than relying solely on caulk.

In summary, caulk can be a helpful component in preventing water seepage. Still, it should ideally be part of a comprehensive strategy that includes proper construction techniques like matching concrete pads to engineered drawings and using sheet metal to divert water from critical areas.

 

DO I NEED A BUILDING PERMIT?

Depending on the use, location and size of your structure – you may need to obtain a building permit. All customers should check with their local permitting office to see if their structure will be within local code and, if required, be able to obtain a permit. Custom Built Structures, Inc does not obtain permitting on behalf of customers. It’s important to notify your local permitting office to obtain your requirements and guidelines to follow. We proudly build to meet local building codes, be sure to specify on your order any building code requirements to ensure proper pricing for your code requirements.

 

Please enable JavaScript in your browser to complete this form.

FINANCING FAQ

Questions about financing? Here are some of our most frequently asked questions! Please contact us for further questions

CAN I GET FINANCING WITH BAD CREDIT?

While we would like to say yes, there’s always a case when we can’t find an approval for someone. However, we do offer Rent-to-Own options that has a very high approval rating that is not based on your credit history! Apply today and get your dream building!

AM I REQUIRED TO PUT MONEY DOWN?

All orders placed must have at least 10% deposit to cover the initial paperwork and setup of your order. This also covers the commission and up front costs with advertising, dealer, salesperson, etc. We recommend asking your salesperson which financing solution may be best based on your financial situation.

CAN I PAY OFF MY FINANCING EARLY?

YES! Each company has different terms on how they will treat accounts that are paid in full early. We recommend all customers to research which provider works best for their financing needs.

CAN I FINANCE MULTIPLE STRUCTURES?

Yes but not all of our financing providers allow for multiple structures. Check our Financing page for more detailed information.